Services 
Commissioning & Startup 

Nearly 70% of early equipment failures can be traced to design, installation or startup deficiencies. Similarly, newly launched plants experience many unnecessary outages due to improper coordination and calibration of protective devices, wiring errors, design errors, etc.. In other cases, the failures don't occur until months after the facility has gone into operation and the warranties have expired. Loose connections or insulation damage may not show up until more equipment comes online and electrical loads increase.

The inspection and testing performed on an electrical power system and its components before initial energization is perhaps the most important preventive maintenance that the system and/or components will receive during their operational life.

When normal start-up testing isn't performed (usually to save a few dollars), the results can be disastrous. Perfectly good switchgear, transformers or other equipment can be “smoked” due to relatively small installation errors.

Emerson’s Commissioning & Startup Services for electrical distribution systems can verify that the equipment has been properly installed. We’ll also determine whether any equipment has been damaged during shipment or installation and ensure that your equipment complies with the purchase specifications and design intent.

Using Emerson’s Commissioning and Startup services will help ensure that your newly installed equipment operates efficiently as an integrated system. Properly done, commissioning projects can pay dividends in the form of decreased rework, fewer change orders, fewer delays, lower operation and maintenance costs, and lower utility bills.

Commissioning and startup testing also provides valuable baseline or benchmark information that can be used to evaluate future maintenance decisions.

 

DocumentationFeatures & BenefitsScope
 Product & Service Documentation
 Brochures
 Corporate Brochure - HVM
1 MBpdfJune 2009B
English
 Electrical Reliability Services - Directory of Locations
404 KBpdfAugust 2009C
English
 Emerson. Your Partner in Electrical Equipment Reliability.
1 MBpdfJune 2009B
English
 Data Sheets - Bulletins - Catalogs
 Electrical Reliability Services Line Card
41 KBpdfJune 2009C
English
 Integrated Partial Discharge Testing and Monitoring Solutions
104 KBpdfMarch 2009A
English
 Partial Discharge Testing for Cables
698 KBpdfMarch 2009A
English
 Partial Discharge Testing for Switchgear
115 KBpdfMarch 2009A
English
 Technical White Papers
 Automatic Transfer Switches
40 KBpdfJanuary 2007B
English
 Low Voltage Circuit Breaker Testing
53 KBpdfJanuary 2006B
English
 Power Quality
39 KBpdfJanuary 2007B
English
 Why Test? High Potential Cable Testing
48 KBpdfJanuary 2006B
English
Quick Links