Services 
Micro Motion Comprehensive Product Training  

Course 2352      CEUs: 2.1

Overview

This 3-day class covers the installation, Configuration and calibration of the Micro Motion metering system. Students will learn the Series 1000/2000 transmitters using ProLink II, FC375 and the Series 3000 interface devices. Students will perform a master reset, use ProLink II to configure the Series 1000/2000, Perform a flow calibration, and solve troubleshooting problems. On the third day, based on student need, we will cover one or all of the following topics: RFT9739 transmitter, T-Series, H-Series, Series 3000 platform.

Topics

• Principles of Operation
• Installation Recommendations
• Transmitter Configuration
• Sensor Calibration
• Extensive Troubleshooting
• Flowloop Demonstrations & Plant Tour

Select a global region for date, location and price information.

Asia Pacific
Middle East & Africa
North America

Quick Links