SmartProcess® Ethylene Furnace
The SmartProcess® Ethylene Furnace solution is part of a suite of offerings that covers the entire ethylene complex and includes best practices from the full breadth of all of Emerson Process Management. Whether it’s severe service, fastacting surge valves, precision flow meters or cracked-gas analyzers and sample systems that are mounted directly on the transfer line, Emerson leads the industry in innovative technologies and solutions.
|
|
For a typical, world-scale ethylene complex with 10 furnaces producing 800 kMT/yr, the potential benefit for the SmartProcess Ethylene Furnace solution is estimated to be more than $2.5 million per year. These benefits primarily come from the following sources:
- Longer furnace run lengths
- All passes coke at same rate
- Estimate 1 extra day of run length per furnace
- Improved ability to meet production plan
- Better visibility into the furnace operation, coking and yields
- Improve planning margin 0.2%
- Reduced unplanned furnace downtime
- 4 hours less downtime per year per furnace
- More stable and reliable operations
- 0.1% ethylene yield improvement.
- Control heater charge rate to a target or operate at a maximum limit
- Control heater severity for maximum yields
- Control a target dilution steam ratio for each pass
- Balance the loads on each pass to equalize the coking rate across the furnace
- Control excess air to maximize energy efficiency
- Maintain the furnace within all process operating limits
- Manage start/stop/decoke transitions for safe, consistent and efficient operations
|
|
|