Services 
Skip navigation links
DeltaV
Ovation
OV001-UNX - Ovation Project Planning
OV001-WIN - Ovation Project Planning
OV010-UNX - Ovation Operator
OV010-WIN - Ovation Operator
OV100-UNX - Starting with Data Acquisition
OV100-WIN - Starting with Data Acquisition
OV115-WIN - Solaris to Windows
OV120-UNX - Upgrade to Ovation
OV120-WIN - Upgrade to Ovation
OV200-UNX-1.8.X - Building & Maintaining Ovation Control
OV200-UNX-1.9.X - Building & Maintaining Ovation Control
OV200-WIN-3.0.X - Building & Maintaining Ovation Control
OV200-WIN-3.1.X - Building & Maintaining Ovation Control
OV210-UNX - Building Ovation Graphics
OV210-WIN - Building Ovation Graphics
OV215-WIN - Ovation Software Project
OV216-WIN - Ovation Hardware Project
OV217-UNX-1.8.X - Hardware/Software Project
OV220-UNX - Ovation System Installation
OV220-WIN - Ovation System Installation
OV230-UNX - Ovation System Administration
OV230-WIN - Ovation System Administration
OV240-UNX - Ovation Historical Data Collection and Reports
OV240-WIN - Ovation Enterprise Historian (eDB)
OV245-WIN - Ovation Process Historian
OV246-WIN - Ovation Report Building
OV248-WIN - EDS
OV250-UNX - Configuring the Ovation Serial Link Controller IO Module
OV250-WIN - Configuring the Ovation Serial Link Controller IO Module
OV260-UNX - Configuring the Ovation Data Link Server
OV265 - Ovation Expert Transition
OV270-UNX - Ovation with HART and Smart Devices
OV270-WIN - Ovation with HART and Smart Devices
OV275-WIN - AMS Suite: Intelligent Device Manager
OV280-WIN - Ovation SCADA System
OV295-UNX - Ovation Third-Party IO Interfaces
OV295-WIN - Ovation Third-Party IO Interfaces
OV300-UNX - Ovation Troubleshooting
OV300-WIN - Ovation Troubleshooting
OV310-UNX - Advanced Ovation Graphics
OV310-WIN - Advanced Ovation Graphics
OV320-UNX - Ovation Network Administration
OV320-WIN - Ovation Network Administration
OV330 - Ovation Advanced Control
OV340-WIN - Ovation Applications with Fieldbus
OV360-WIN - Ovation Security
OV370-WIN - Ovation Steam Turbine Control
OV380-WIN - Ovation Boiler Control
OV400-UNX - Ovation Certification
OV400-WIN - Ovation Certification
PROVOX
RS3 Systems
Terminal Automation
WDPF
Ovation Steam Turbine Control 

Course OV370-WIN

Overview

This course is designed to provide in-depth information about the Ovation® Turbine Control System (TCS). Turbine simulators will be used to demonstrate turbine operation, graphics and control logic. Turbine overspeed protection and trip functions will be closely examined. This course includes calibration and troubleshooting exercises on the Speed Detector and Valve Positioner modules. Students will also learn how to tune the turbine control feedback loops and turbine valve curves using methods developed by Emerson.

Prerequisites

Students must have a good understanding of the Ovation system architecture. It is recommended that students attend the OV100-WIN,and OV210-WIN as well as either the OV200-WIN-3.0.X or OV200-WIN-3.1.X courses prior to attending this course.

Duration

Five Days

Objectives

Upon successful completion of this course, using the reference material provided, the student will be able to:

  • Understand key Ovation operator functions as they apply to turbine control including the process graphic, alarm, trend, and point information systems
  • Identify basic functions of turbine control logic drawings
  • Recognize how the turbine control logic connects to the turbine control graphics
  • Identify the fail-safe design components: (1) power, (2) controller, (3) relay module
  • Understand the Turbine First Out trip logic and Sequence of Event (SOE) alarm reporting
  • Configure and test a Speed Detector module
  • Configure and calibrate a Valve Positioner or Servo Driver module
  • Identify logic sheets that require field tuning
  • Discuss field-proven tuning examples
  • Retrieve historical trend data for valve curve tuning \
  • Import data into an Excel spreadsheet; calculate and plot new valve curves

Select a global region for date, location and price information.

North America

 

 

Quick Links